Project 2
DC Water Public Space Contract #200110
DCKA-2021-C-0020- Federal Aid Pavement Restoration (NHS)
DCKA-2023-B-0035 S STREET, NW REVITALIZATION, FROM 7TH ST, NW TO FLORIDA AVENUE, NW
‘DCKA-2018-C-0084- Federal Aid Pavement Restoration Citywide
DCKA-2019-C-0004 – Citywide Porous Flexible Pavement
CW95800 P3 Design and Construction
Pentagon Apex Restoration
Duration: Varies
$11.0M
Labor, material, equipment, services, and incidentals required for roadway improvements. The scope of the work includes roadway reconstruction, sidewalk, curb and gutter, traffic signal foundations, and green infrastructure